Project details

HESABATU RURAL WATER SUPPLY SCHEME

detailed survey, designing and drawing, Construction of Pump House, 9.00 MLD capacity Conventional Water Treatment Plant, RCC Elevated Service Reservoir- (i) 9.35 Lakh Litre capacity with 14M Staging, (ii) 5.30 Lakh Litre capacity with 18M Staging, (iii) 4.80 Lakh Litre capacity with 14M Staging, (iv) 4.60 Lakh Litre capacity with 18M Staging, UGR 7.0 Lakh Litre capacity, Staff Quarter, Compound Wall, N.H. Crossing, Railway Crossing, Supplying and laying Raw and Clear Water Rising main and Distribution Network, House Connection, Supplying and Installation of Centrifugal Pump motor and Five years Operation & Maintenance with allied works etc. all complete job.